Removal and Instalation of the Stern Thruster

In the first week of november of 2010, the Propulservice was in the Oil Trace vessel of the PanMarine company, removing and installing the third thruster of stern.

Due a problem in the instalation of the grid in your last dockdues, the thruster blades hit against the grid. The vessel couldn’t stop for a long time, and not having a dock for the repair, The Propulservice was contacted to do the replacement of the thruster with the floating vessel.

The vessel was moored in the Viana island, where is the shipyard Enavi Renavi, in the Baia de Guanabara, between  5 and 11 of november. The action was a success, reaching the strict compliance with the schedule required.

Esta entrada foi publicada em Notícias. Adicione o link permanente aos seus favoritos.

Os comentários estão encerrados.